Traffic Management System Al Barsha Waterproofing

image

This Project inaugurated by His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, Traffic Systems Centre constructed by the Roads and Transport Authority (RTA). The facility is considered one of the biggest and most sophisticated traffic control centres worldwide in terms of smart technology use and the management of traffic systems in this project we have done Sub Structure Waterproofing, Roof Waterproofing & Wet Area Waterproofing please check the material details given below that we have used.

Sub Structure Waterproofing: In Sub Structure we have used Rubberized Bituminous Coating, Bituminous Primer with Double Layer Waterproofing Membrane & Bituminous protection Board.

Roof Waterproofing: In Roof we have done Light Weight Foam Concrete, Double Layer Torch applied Waterproofing Membrane, 100mm thick extruded polystyrene insulation board, geotextile, Aluminium Flashing topped with sealant & Lose laid Precast Tiles on PVC spacers.

Wet Area Waterproofing: In all the Wet Areas (Toilet, Bathroom & Pantry) we have use Polyurethane Liquid Coating.

Link: https://www.youtube.com/watch?v=Y3cV06HVFRM